CONSTRUCTION
- 30 December 2020
- Comments Off on CONSTRUCTION
- superuser
Our well-equipped laboratory and the excellent workforce of our company allow us to deal with possible tight schedules.
The design department needs 24 hours for the design – approval of the circuits (for non-standard applications) and, in collaboration with the production department, the construction is completed as soon as possible.
The equipment we supply is manufactured with practical techniques, related to European standards for the construction of low voltage panels and automation panels.
Our design and construction techniques always combine the guarantee of the best quality and the lowest possible prices.
Recent Comments